哈希游戏
热门标签

Fukushima debris removal delayed by another year

时间:1个月前   阅读:2   评论:2

欧博allbet网址www.allbet8.vip是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠博彩网址www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩网代理申请、博彩网会员开户的线上博彩的官方平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:erc20和trc20转换:Inari cautiously optimistic on prospects

下一篇:www.a55555.net彩票网:MPOCC has never endorsed other parties to provide consultation services for palm oil dealers - MPIC

网友评论